Construction of a building designed with high sustainability criteria
Features
Execution of the installations of buildings A and B, as well as the vertical partitions. Subsequently, assembly of the false ceilings and finishing elements will begin.
The façade has a very advanced curtain wall. The maintenance walkways and the wooden beam "skin" have been started.
Implementation of the roof rooms of halls 1 and 2, the rooms of building A (where the AHUs, aerothermal and technical gas equipment are mainly located), the fire-fighting pumps room and the geothermal room.