New central section of the Topo underground system in Donostia
Facilities
Status
In 
progress
Location
San Sebastián (Guipúzcoa)
Scope
Electromechanical installations in pumping stations
Features
  • Expansion of the 13.2 kV network
  • Low-voltage connections in the new stations and pumping wells
  • Installation of capacitor banks
  • Uninterruptible power supply (UPS) systems
  • Low-voltage and control cables
  • Lighting, ventilation and fire protection