Construction of an electrical substation and transmission line, along with the expansion of six additional substations
Features
Construction of a substation in the capital of Honduras, which also includes the expansion of three substations in the northern region, as well as the construction of a 27 km transmission line connecting the San Pedro Sula Sur and Progreso substations.
Expansion of six more substations. Of particular note is the expansion of the Comayagua substation, which supplies the new Palmerola International Airport, which came into operation at the end of 2021 and in which Elecnor participated in the construction of the power station, the fire station, the control tower and the beaconing of this airport infrastructure.