The 388 km 500 kV transmission line, with a single-circuit configuration and four conductors per phase, will have more than 825 towers and will connect the Marimbondo 2 (Minas Gerais) and Campinas (São Paulo) substations.
Project execution under the EPC or turnkey modality. Includes the expansion of the two substations.