Vilnius-Klaipeda railway electrification project
Railways
Start
january
2024
End
december
2025
Scope
Railway electrification for freight and passenger transport
Features
  • Electrification of the 730 km railway corridor across the country, from the border with Belarus to the maritime port of Klaipeda.
  • Final phase of the construction of sections 1 and 2 of the 3 sections into which the project is divided.
  • Commissioning of the first 150 km of catenary and the first substation equipped with 2x25 kV SFC systems, of the six that make up the power system.